Search Results

169. Headhouse, No. 6 Bartley, Island Creek Coal Company, Beartown Project

170. Excavation for Boiler House Foundation, No. 6 Bartley, Island Creek Coal Company, Beartown Project

171. Gallery, No. 6 Bartley, Island Creek Coal Company, Beartown Project

172. Balasting Tramroad with Crushed Rock, No.6 Bartley, Island Creek Coal Company, Beartown Project

173. Empty and Load Track 1400 Feet From the Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

174. Tramroad 2000 Feet From the Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

175. Empty and Load Tracks at the Cross Over, No. 6 Bartley, Island Creek Coal Company, Beartown Project

176. Tramroad Showing Trolley Supports, No. 6 Bartley, Island Creek Coal Company, Beartown Project

177. Connecting Last Link of Track Between Portal and Head House, No. 6 Bartley, Island Creek Coal Company, Beartown Project

178. Track Work Near Crusher and Temporary Rock Dump, No. 6 Bartley, Island Creek Coal Company, Beartown Project

179. Tipple Gallery and Head House, No. 6 Bartley, Island Creek Coal Company, Beartown Project

"Showing control box, parts of shakers, wash box, raw coal conveyor, and lighting arrangement."

180. Inside of Tipple, No. 6 Bartley, Island Creek Coal Company, Beartown Project