Search Results

Disco fuel brought by conveyor to screen house and loading boom (shown), where blended and sized for market. At right, ascending conveyor.

1. Disco Fuel

The incline is 4360 feet long and has a vertical rise of 1335 feet. Six cars each carrying 4 tons each would be loaded each trip.

2. Incline at Clover Splint Mine

Dump trucks lined up to dump coal for processing through the plant.

3. Dumping Raw Coal at Georgetown Preparation Plant

View of the plant from across river.

4. Georgetown Preparation Plant

5. Preparation Plant and Tipple at Bishop Mine, Pocahontas Fuel Company

Scenic view of the Harmar mine facilities.

6. Harmar Preparation Plant

7. Itmann Preparation Plant, Pocahontas Fuel Company

Mine cars and buildings around the preparation plant.

8. Hutchinson Mine Preparation Plant

Mine cars and buildings around the preparation plant.

9. Hutchinson Mine Preparation Plant

A ship sits in Salem Harbor Dock next to the coal facility.

10. Ship Docked at Coal Facility, Salem Harbor Dock, Pocahontas Fuel Company

11. Ireland Mine Portal Area Supply Slope

C.E.T. Drying Plant. Storage Pool in foreground.

12. Hanna Pipeline