Search Results
- IDNO:
- 003363
- Title:
- Incline at Clover Splint Mine
- Date:
- 1952/05/02
- Description:
- The incline is 4360 feet long and has a vertical rise of 1335 feet. Six cars each carrying 4 tons each would be loaded each trip.
- IDNO:
- 003365
- Title:
- Coaling Station
- Description:
- A few mine buildings and some houses.
- IDNO:
- 003366
- Title:
- Raw Coal Conveyor System
- Description:
- Conveyor belt in the middle of the mountains.
- IDNO:
- 003369
- Title:
- Champion No. 1 Preparation Plant
- Description:
- Filled coal cars outside of the Preparation Plant.
- IDNO:
- 003372
- Title:
- Ireland Mine Preparation Plant
- Description:
- 'The Plus 6" coal will be crushed to minus 1.5" and two 16,6" Chance Cones will wash the 6 x 3/8 coal. Current production of approximately 1800 tons per day is crushed to minus 1.25" then trucked to the storage yard of the new Kammer Power plant.'
- IDNO:
- 003375
- Title:
- Ireland Mine Portal Area Supply Slope
- Date:
- 1958/06/01
- IDNO:
- 003376
- Title:
- Mathies Mine Preparation Plant
- Description:
- Coal buildings at the Mathies Mine, a division of Pittsburgh Consolidation Coal Co.
- IDNO:
- 003378
- Title:
- Williams Preparation Plant, Consolidation Coal Company
- Description:
- Filled coal cars are lined up outside of the Williams Preparation Plant.
- IDNO:
- 003379
- Title:
- Georgetown Preparation Plant
- Description:
- 'The Georgetown Preparation Plant is the world's largest commercial coal preparation plant, having a capacity of 1,500 tons per hour of raw coal, or 1,275 tons per hour of clean coal. The plant has facilities for dumping bottom-dump tractor-trailer and end-dump trucks, and for rotary and bottom dumping of railroad cars. Coal from these dumps goes into a 1,500 ton bin, from which it is conveyed on a 641 foot belt conveyor to the primary shaker screens. Whereas the conventional coal perparation plant provides only one circuit for all coal washed, the Georgetown plant is unique, in that it provides three separate washing circuites, each of which is designed to most efficiently clean a certain size fraction.'
- IDNO:
- 003380
- Title:
- Georgetown Preparation Plant
- Description:
- Division of the Pittsburgh Consolidation Coal Co.
- IDNO:
- 003381
- Title:
- Hutchinson Mine Preparation Plant
- Date:
- 1957/06/12
- Description:
- Mine cars and buildings around the preparation plant.
- IDNO:
- 003383
- Title:
- Hutchinson Mine Preparation Plant
- Date:
- 1957/06/10
- Description:
- Mine cars and buildings around the preparation plant.