Search Results

The incline is 4360 feet long and has a vertical rise of 1335 feet. Six cars each carrying 4 tons each would be loaded each trip.

3361. Incline at Clover Splint Mine

Scenic view of Mine No. 32 at Fairmont, W. Va.

3362. Consolidation Coal Company Mine No. 32, Fairmont, W. Va.

A few mine buildings and some houses.

3363. Coaling Station

Conveyor belt in the middle of the mountains.

3364. Raw Coal Conveyor System

Scenic view of buildings and houses at Mine No. 32, Fairmont, W. Va. 'Credit must be given. Not to be reproduced without written liscense from William Vandivert.'

3365. Consolidation Coal Company Mine No. 32, Fairmont, W. Va.

Federal Mine No. 1 mine plant at Grant Town, W. Va.

3366. Federal Mine No. 1, Grant Town, W. Va.

Filled coal cars outside of the Preparation Plant.

3367. Champion No. 1 Preparation Plant

Side view of the preparation plant located on the B&O RR, Owings, W. Va.

3368. Mine No. 32, Owings, W. Va.

Cars and machinery are parked outside mine plant buildings.

3369. Ireland Mine Shamrock Portal Shop and Supply Slope

'The Plus 6" coal will be crushed to minus 1.5" and two 16,6" Chance Cones will wash the 6 x 3/8 coal. Current production of approximately 1800 tons per day is crushed to minus 1.25" then trucked to the storage yard of the new Kammer Power plant.'

3370. Ireland Mine Preparation Plant

'Two Joy 3-JCM and one Goodman 300 continuous miners are now in service producing coal. These machines have roof bolting machines as an integral part of their equipment. Two Joy 3-JCM machines are also being used brushing top and bottom where additional height is needed in the main haulage entries.'

3371. Ireland Mine Machine Shop Fully Equipped

3372. Mine No. 155 Preparation Plant, Consolidation Coal Company, Van Lear, Kentucky